Travaux de rénovation de deux groupes (G1 et G3) & du poste élévateur à la centrale hydroélectrique de Mobayi-Mbongo dans la province du Nord-Ubangi / Renovation Works for Two Units (G1 and G3) and the Pumping Station at the Mobayi-Mbongo Hydroelectric Power Plant in the North Ubangi Province (EXPIRED)

Pedido de Propostas

Informação Geral

República Democrática do Congo
   North Ubangi Province
   001/AGREE/MRHE/UCM/PM/2026/MT
   24 de Mar, 2026
21 de Abr, 2026
  
Unité de Coordination et de Management des Projets (UCM) du Ministère des Ressources Hydrauliques et Electricité
   • The bidder must provide certified financial statements for the past five (5) years (2020, 2021, 2022, 2023, and 2024);

• The bidder must have average annual revenue of at least USD 20,000,000 (twenty million US dollars) over the past five (5) years;

• The bidder must provide evidence of liquid assets and/or credit facilities of at least USD 3,500,000 (three million five hundred thousand US dollars); a bank statement for the line of credit or credit facility must be provided for this purpose.

• The bidder must provide evidence of having satisfactorily and substantially completed, as a main contractor, member of a consortium, general contractor, or subcontractor, a minimum number of similar contracts as stipulated below, executed within the past fifteen (15) years from January 1, 2010, to the bid submission deadline:
(i) Two (2) contracts with a minimum value of twenty million US dollars (USD 20,000,000) each, which have been satisfactorily executed and substantially completed; or

(ii) One (1) contract valued at least forty million US dollars (USD 40,000,000) that has been satisfactorily executed and substantially completed.

Each contract submitted under this criterion must include both components of the work and meet the following minimum essential requirements:

(i) Rehabilitation work on hydroelectric power plants with an installed capacity of at least 10 MW, including the supply, installation, and commissioning of turbine-generator units (with units having a capacity of at least 3 MW each);

(ii) Rehabilitation work on pumping stations, including the supply, installation, and commissioning of bay and control equipment with a capacity of at least 10 MW.

Note: Only similar contracts supported by a certificate of completion or acceptance report will be considered.
   Francês
   Licitação internacional
   publicado: 24 de Mar, 2026

Informação para contato

   Mr. Jean-Pierre Mukadi Kalombo
PMP Coordinator
Project Coordination and Management Unit of the Ministry of Water Resources and Electricity (UCM)
1022, Avenue des Forces Armées de la RDC (formerly Avenue du Haut Commandement)Zimbali & Gombe River Concession / 2nd floor of the administrative buildingGombe Commune, Kinshasa, Democratic Republic of Congo
Gombe Commune, Kinshasa
República Democrática do Congo
   +243 847 824 066
   Clique aqui
   https://www.ucmenergie-rdc.com/ or https://mrhe.gouv.cd/

Bens, obras e serviços

Instalações de abastecimento de electricidade Serviços de reparação e manutenção de compressores Construção de central hidroeléctrica Grupos geradores de motor de ignição por compressão Grupos geradores de motor de ignição por faísca Instalações de média tensão Serviços de electricidade Bombas de água Serviços de reparação e manutenção de bombas Construção de estação de bombagem Serviços de reparação e manutenção de geradores

Documentos de licitação e anexos

 
  • Anexo (278 KB; 11 de Fev, 2026)
  • Solicitação (82 KB; 24 de Mar, 2026)
     Download documentos

Texto original


More information: Clique aqui
Favor notar que este aviso é somente para sua informação.
Tentamos o melhor possivel ter informações corretas e atuais disponíveis no nosso web site, porêm não podemos garantir que toda informação esteja sem erros.
Se você tiver alguma sugestão de atualizações/correções para este aviso, favor entrar em contato.