Shell Kit For Memu Dmc2 Jk 946 A. Roof Assembly 94416001 000 01, Alt 'Nil' - 1 No. Lo Cation Of Sidewall 94414001 000 01, Alt 'Nil' - 1 No. End Construction Pail End 94615001 000 01, Alt 'N Il' - 1 No. Firm Shall Fulfill The Manufacturing Facility As Per Icf/Md/Specn-200, Issue Stat Us 01, Rev 04 With Amendment No 01. Firm Shall Fulfill The Manufacturing Facility As Per Icf/Md/Specn-315, Issue Status 01, Rev.0 0With Amendment No 01. B.Supply Of One Coach Se T Of Body Shell Items And Partition Frames For Memu Dmc2 Jk 946 To Drawing Nos: 1. 9441 0003 000 01, Alt 'A' - 1 No 2. 74510257 000 01, Alt 'Nil' - 1 No 3. 94410004 000 01, Alt 'Nil' - 1 No 4. 7 4510045 000 01, Alt 'Nil' - 1 No 5. 94410005 000 01, Alt 'Nil' - 1 No 6. 94410002 000 01, Alt 'B' - 1 No. 7. 94410076 000 01, Alt 'Nil' - 1 No 8. 94410072 000 01, Alt 'Nil' - 1 No 9. 94410054 000 01, Alt 'Nil' - 2 Nos. C. Under Frame Arrangement 94411001 000 01, Alt 'A' - 1No. Firm Shall Fulfill The Manufa Cturing Facility As Per Icf/Md/Specn-147, Issue Status 01 Rev.02 With Amendment No.02. Sp Ecial Condition : Packing As Per Icf/J&T/Misc-2201, Alt 'E'. Packing As Per Icf/J&T/Sk-1809, Alt 'A '. Packing Condition As Per Drg.No.Icf/J&T/Misc-2487, Alt 'B' The Underframe Should Be Su Pplied As Normal Side Up & Side Bearer Side Down. Packing Conditionas Per Icf/J&T/Sk-186 5, Alt 'A'. (A) Raw Material Stage # Ensure The Raw Material Used Using Portable Spectrometer (B) Jig St Age # Assembly Of Front Part With Sole Bar. # Assembly Of Modular Frame Arrangement. # Weld Param Eters To Be Checked & Recorded (C) Trestle Stage # Marking, Drilling & Tapping Of Holes Wherever Nece Ssary. # Marking & Placing Of Detail Items. # Complete Welding Wherever Necessary. # Weld Paramete Rs To Be Checked & Recorded # Assembly & Welding Of Trough Sheets. # Dimensional & Visual Checks. # Punching Of Serial No & Ensuring Proper Traceability. (D) Surface Preparation And Painting Stage. # S Hort/Sand Blast To The Requirements. # Painting Process As Per The Specification. # Visual Inspection. # Final Product Inspection. Note: Application Of Aluminium Welding Coat To Rcf Spec Mdts-28272 Late St Revision On Top Surface Of Cross Members Shall Be Ensured Before Welding The Trough Floor With Cros S Members To Avoid Bi-Metallic Corrossion. [Safety Item] [ Warranty Period: 30 Months After The Da Te Of Delivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitt Ed: Max 8 Lacs ] ]
Pedido de Propostas
Tentamos o melhor possivel ter informações corretas e atuais disponíveis no nosso web site, porêm não podemos garantir que toda informação esteja sem erros.
Se você tiver alguma sugestão de atualizações/correções para este aviso, favor entrar em contato.
