Busca

Penta Work Station-Metal Powder Coated Legs At The End Shared Condition .System Shall Also Have 120 Mm High Powder Coated Standalone Panel Legs To Give The System An Elevated Look. Split Tiles On Main Spine .Combination Of Two Finishes For The Top Tiles On The User Side Shall Be Split Fabric Tackable Along With Split White Board. Wire Management Through Main Spine-Wires Shall Be Taken Into The System Through Cable Ducts From The Junction Boxes And It Is Carried Upto The Panels Through Concealed Conduits Inside The Blocks. Worksurface-Out Of 25 Mm Thk Prelam Particle Board With Flat Pvc Lipping Edge Banding Of Size 150 0 Mm W2 X 600 Mm D. [ Warranty Period: 30 Months After The Date Of Delivery ] ]

Pedido de Propostas

Informação Geral

   Bihar
   10 de Abr, 2026
   Inglês
   Outro
   publicado: 10 de Abr, 2026

Texto original

SAMASTIPUR DIVISION-STORES/EAST CENTRAL RLY 
72255622 



Penta Work Station-Metal powder coated







Published 








Goods & Service



 


13/04/2026 11:30 


 






Tender No: 
72255622
Dept/Rly: 
SAMASTIPUR DIVISION-STORES/EAST CENTRAL RLY
Closing Date/Time:  
13/04/2026...
Opções de assinatura

Básico

Completo

Corporativo

US$ 550,00/ano

US$ 1.000,00/por ano

Custo mediante solicitação

Comprar Comprar Fale conosco
Favor notar que este aviso é somente para sua informação.
Tentamos o melhor possivel ter informações corretas e atuais disponíveis no nosso web site, porêm não podemos garantir que toda informação esteja sem erros.
Se você tiver alguma sugestão de atualizações/correções para este aviso, favor entrar em contato.